The Planner / Scheduler is responsible for advanced planning, scheduling, progress measurement, change management implementation and analysis that may involve a major project or several smaller projects. A thorough understanding is required of policies, methods, and procedures that includes advanced Planning and Scheduling techniques, Risk Analysis, Risk Management, and support of project objectives.
- Implement Project Planning/Scheduling strategy, plans and procedures, reflecting both Company and contractor roles, responsibilities and expectations.
- Coordinate the development and implementation of project Work Breakdown Structures (WBS) and Cost Breakdown Structures (CBS) in conjunction with Project Lead, Project Cost Engineer and Contractor project controls leads, and in conjunction with Project Execution Plans.
- Preparing Staffing, Engineering, Construction progress and customized reports.
- Perform probabilistic analysis on integrated schedules and contractor schedules.
- Conduct the required project schedule analysis, critical path analysis and schedule risk analysis for the project as a whole.
- Analyze deviations from the baseline in the Project Master schedule highlighting bottlenecks / delays and propose corrective actions.
- Prepare the Integrated Planning / Scheduling contribution to the Monthly Project Report and specific reports / presentations.
- Analyze and highlight the overall schedule impact of any variance / change order.
- Prepare resourcing plans for the overall and individual project phases, identifying any excessive peak numbers and making recommendations for peak leveling.