Under the general direction of the Train Control Upgrade Project Manager and Train Control Upgrade Project Lead Engineer, the Assistant Engineer performs system engineering work on the Train Control Upgrade Project. During the project design phases, the Assistant Engineer will support the project by reviewing engineering designs and documents submitted by the CBTC Supplier. The Assistant Engineer will work on systems integration between the train control system and various wayside components such as switch machines, vehicle detection systems, and interlockings. The Assistant Engineer will also assist a dedicated team working on software integration between the CBTC system and other technology systems such as CAD/AVL, asset management systems, SCADA systems, and databases. The Assistant Engineer will contribute to the civil engineering design for any enabling works, including developing electrical drawings, schematics and plans for any cable, conduit, or other connection infrastructure to accommodate the train control system. The Assistant Engineer will participate in design reviews, activities, and technical coordination meetings between the Supplier and the equipment installers.
During the construction and testing phases, the Assistant Engineer will assist in monitoring the progress of construction and compare field conditions to the design drawings. The Assistant Engineer will participate in and monitor train control system testing from the control center, along the wayside, and in the vehicles to ensure that the testing, safety certification, and commissioning of onboard train control equipment is completed according to the project specifications. The Assistant Engineer will participate in the development of installation and testing plans to facilitate this process.
Examples of Important and Essential Duties: