Ensures production volume and size achievement based on Curing mid-term demand, by sequencing appropriately the production areas via the use of SAP PP/CGMS and related modules.
- Raise awareness and provide information about ESH responsibilities and duties.
- Sequencing of production in tire manufacture for curing, green tire assembly, component, required sub-components and compound for plant production areas to achieve optimal production output and size achievement as per the agreed plan with plant operations.
- Controlling the phase-in and phase-out processes in all areas of tire production.
- Regular monitoring with-in the shift of order achievement for all responsible production processes to SAP PP.
- Initiate and communicate the required corrective actions and changes to the order sequence to Production processes to minimize/avoid production losses. Regular reporting of current status.
- Transparently communicates the gaps and hindering factors in the production sequence (e.g., process, quality, machine reliability limitation).
- Breakdown the daily plan. Taking into account plant constraints, quality requirements and KPIs.
- Optimizes the lot size and stock structure to ensure cold & hot preparation do not lack of compounds.
- Ensures the preparation sequencing planner are trained on Mixing sequencing processes as they will act as back-up during the shift (after 5PM and over the weekend).
- Fills-in the monthly Order Achievement reports provided by IE in preparation of the monthly incentives
- Controls and coordinates phase out process.
- Analyze daily the fulfillment of size achievement KPI and take corrective actions are needed.