Build relationships with other design team members.
Project Role:
Ability to implement Quality Control Systems.
Undertaking structural Modelling and Detailing on global projects
Act as a Responsible Leader on large and medium projects.
Ability to supervise & manage BIM team (minimum 10 person).
Working with the technical specialist on delivery of major projects using BIM/CAD software packages.
Reviewing the work of other CAD/BIM delivery teams
Periodic review of projects with designer along with project leads in terms of technicality and performance or issue with client.
Ability to attend coordination meetings.
Company Role:
Contribute to the development of the company systems by reviewing existing procedures and commenting using the feedback system.
Take part in task groups and represent team that you are working in.
Attend team meetings and provide feedback on your/company development.
Applying policies relating to health & safety, quality, and training
Engineering Function:
Sound Knowledge in project requirements in BEP, LOIN Matrix, MIDP, MDS, NWC, NWD etc.,
Sound Knowledge in Structural Engineering detailing,
Sound knowledge in High rise building systems and Mixed used building structures.
Knowledge in composite structures,
Ability to read and understand other discipline drawings (Arch + MEP + Fa莽ade etc.,)
Ability to co-ordinate drawings with other members of the design team.
Ability to do the project set up as per client and project requirements.
Ability to Co-ordinate with other disciplines team members (Arch + MEP + Fa莽ade etc.,)
Strong Knowledge in BIM/CAD standards to setup Industry standard BIM models
Production of BIM Models/CAD drawings from sketches prepared by Engineers and by reference to other consultant鈥檚 drawings all in accordance with WME BIM/CAD standards.
Liaison with other members of the design team over details to ensure a co-ordinated set of drawings is produced.
Setting up and maintaining job drawing filing system to office standard.
Drawing list to be shared within first week of project start
All BIM related RFI to be raised through project lead as per project communication protocol.
Markups received shall be as per mark up cut-off date as laid out by project lead.
Discipline BIM lead to review the mark ups and quality of output to ensure in line with mark up
If any additional mark-up received during the QA shall be raised to PL/DL/BL and review the impact resources and time frame.